Practical lessons from production data systems — what breaks, why it breaks, and how to check your own.
Production lessons
Nov 9, 2026 · 6 min read
An approver clicked approve once. The system triggered the write function twice. A 90-day audit found about one in four approved requisitions triggered the ERP write twice — because a deduplication ID built from the current time deduplicates nothing, and the worker had no gate before the write.
Read the article →
Production lessons
Nov 9, 2026 · 6 min read
Every job was green. Every pipeline run succeeded. And about 15% of the purchase orders waiting for approval were invisible to the people supposed to approve them — because an INNER JOIN on a cross-system ID silently drops the rows that don't match.
Read the article →
The idea
Nov 17, 2026
A job can succeed while the data is wrong. Every dashboard green, every check passed — and the numbers still wrong. What the phrase means, and the four failures that prove it.
Read the idea →
More lessons from production systems are on the way — one principle, one real failure, one checklist at a time.